Guide rail 1-leaf

TS 5000 L-E * Overhead door closer with guide rail, for opposite hinge side, for single leaf doors of up to 1400 mm with electric hold-open device

Door closer TS 5000 E Overhead door closer with guide rail for single leaf doors of up to 1400 mm leaf width with electric hold-open device
  • Closing force of EN 2-6 with variable adjustment
  • Operating voltage 24 V DC
  • Can be used for right and left hand doors without conversion
  • Electric hold-open device in the guide rail with hold-open area from 80°
  • Smoke switch control unit can be connected, whose signal makes the door close automatically in the event of a fire
  • Hydraulic latching action which accelerates the door shortly before it is closed
  • Closing speed can be individually adjusted
  • Integrated back check, slows down doors that are thrown open forcefully
  • Visual closing force display for easy control of the setting
  • All functions can be adjusted from the front
Buy now

Application Areas

  • Fire and smoke protection doors
  • Right and left single-action doors
  • Single-action doors up to 1400 mm leaf width
  • Door leaf installation opposite hinge side
  • Hold-open systems with integrated hold-open device

Technical data

TS 5000 L-E
Closing force in accordance with EN 1154 EN 2 - 6
Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm 1400 mm
Leaf width (max.) 1400 mm
Type of installation Door leaf installation opposite hinge side
Input voltage 24 V DC
Suitability for fire protection doors Yes
Closing force adjustable Yes, stepless
Adjustable closing speed Yes
Latching action adjustable Yes, via valve
Back check integrated Yes, hydraulically adjustable
Position of closing force adjustment Front
Visual closing force display Yes
Hold-open function Electrical
Hold-open range 80 °

Downloads

Product shot

Product data sheet

Installation instructions

Wiring diagram

Supplementary sheet

Tender texts

Flyer/folder

Product brochure

Declarations of performance

Environmental declaration

3D model

Installation drawing

Contact

GEZE Central +351-236-219-717