Fresh air systems

RWA K 600 T Retractable arm drive for air intake systems for installation on doors

RWA K 600 T Retractable arm drive suitable for opening doors and windows as an air vent opening and for ventilation
  • 90° door opening in less than 60 seconds
  • Powerful drive with high torque
  • Connection cable easy to replace by means of plug
  • Integrated status contact for electric strike control unit or feedback signals
  • Door remains freely accessible due to the freely positioned activation of the lever by means of a pressure roller
Contact us

Retractable arm drive for air intake systems for installation on doors

Application Areas

  • Use in the supply air system where large opening angles are required
  • Single and double leaf smoke and heat extraction fresh air doors
  • Installation on the hinge or opposite hinge side

Technical data

RWA K 600 T
Dimensions 421 x 40 x 56 mm
Housing material Aluminum
Compressive force 600 N
operating voltage 24 V DC
Current consumption 1.4 A
Residual ripple 20 %
Duty rating 30 %
Connection cable length 5 m
Special length of power supply cable 10 m
Min. core cross section 0.5 mm²
Number of cables 5 cores
Service temperature -5 - 75 °C
IP rating IP32
protection rating III
Synchronising function Yes
Adjustable opening speed (ventilation) Yes
Additional locking available Yes
Type of additional locking mechanism Locking drive
End position cut-off extended Internal path sensor
End position cut-off retracted Internal path sensor
Overload cut-off Yes
Number synchronisation drive units 2

Contact