Perlan 140 set for timber leaves

Track Perlan 140 * Track for sliding door fitting

Perlan 140 Track
  • Track for sliding door fitting with leaf weight up to 140 kg
Contact us

Application Areas

  • For leaf weights up to 140 kg
  • For timber, plastic, glass and metal leaves
  • Suitable for Perlan roller carriage

Technical data

Track Perlan 140
Leaf weight (max.) 140 kg

Downloads

Variants & Accessories

Contact

GEZE Central +351-236-219-717